Quality control
Quality control
in the textile industry involves certain standards or guidelines that guarantee
that a product meets certain parameters as well as customer satisfaction. Determine whether your product meets the requirements to use quality control measures. Set up your testing and control practices in every process.
Quality control for the knit fabric dyeing process
For quality control below subsequent processes are followed-
Process control for Batch
i. Need Batch
ratio
ii. Nozzle rope
length
iii. Nozzle a batch card will be used
iv. Roll mark
must be used with a yellow marker.
v. Yarn lot
mixing, M/C quality mixing.
vi. Greige
fabrics according to dia, GSM, separately will be arranged.
vii. Batch
strick will be given.
viii. From
turning nozzle to nozzle separate
ix. Before the overlock yellow mark will be checked.
x. Overlock will
be done according to the course.
Process control for finishing
i. Dia separation
has to do with the squeezer and dryer
ii. Dia mixing has nothing to do with the squeezer and dryer.
iii. Batch cards
will be given.
iv. Quality tag
will be used.
v. Floor
separation like sample rib/Turning/Dryer/Compacting/OK fabric/Not ok fabric.
vi. Before
compacting shrinkage has to test.
vii. Dia to dia
shrinkage has to be tested.
viii. After
cutting GSM have to make a swatch board.
Process control for dyeing
1. Loading (%):
According to rope length, reel speed, and cycle time.
2. Loading way
and unload side mark.
3. Seam – Left/Right
in any roll.
4. M: L for
scouring 1: 6/ 1: 8.
5. Water should
be treated by the demineralization process.
6. Scouring
Temperature and Time should be calculated.
7. Need to do an absorbency-like drop test (1-3cm).
8. Scouring hot
wash temperature 95°C in 15 min.
9. Normal wash
cold temperature in 10 min.
10. Scouring pH maybe 10/11/12/13.
11. Enzyme pH maybe 4.0/4.5/5/5.5/
12. Enzyme time/temperature
should be calculated.
13. Enzyme wash
above 80°C in 10 min.
14. Dyeing
process number
15. M: L for
dyeing 1: 6/1: 8/1: 10/
16. Salt dossing
linear/ progressive.
17. Color
dossing linear/ progressive.
18. Soda dossing
linear/ progressive.
19. Color steam
& time should be calculated.
20. Warm wash at
50°C for 10 min.
21. Neutralization
at 50°C for 10 min.
22. Soaping
temperature around 80-90°C for 10 min.
23. Fixing pH
around 5.0
24. Softener used
for hand feel good/ medium.
25. Softener pH
around (4.5-5.0)
26. Unloading nozzle-wise.
Quality control for shade
1. Knitting: Yarn a lot will be equally distributed according to ratio.
2. Batch: Yarn a lot do not mix into a batch. Dia ratio must be maintained for making a batch.
A floor knit greige fabric will be taken very carefully separately.
3. Dyeing:
Color addition will not be given to dyeing. Absorbency, leveling agent, progressive
dosing, after-bath drain wash, clear wash before soaping, water pH, water TDS, and water hardness, for re-wash sequestering agent addition, will be followed. Every
batch must be unloaded by shade confirmation.
4. Squeezing:
After squeezing one roll quickly check by drying and compacting. Note down the temperature and other parameters. Online, the shade will be checked and made shade
board.
5. Drying: For
full batch drying dryer shade continuity will be attached by the dryer operator,
authorized by the in-charge.
6. Compacting: For batch finishing, the starting shade will be checked and reconfirmed by the In-charge and finally, be dyeing manager. Then shade board and continuity will be made.